Solar infrastructure partnership in India
Solar Feasibility & Partnership Assessment

Transform Your Property Into a Solar Energy Asset

Professional rooftop and land solar feasibility assessment for residential, commercial, and industrial properties in India. Company invests 80% of project cost — you contribute only 20%.

Engineering-based methodology
80% company investment
Transparent partnership terms
No sales pressure

5.5+

kWh/m²/day

Avg Solar Irradiance

80%

Company Cost

Infrastructure Investment

20%

Owner Cost

Your Contribution

25yr

Lifespan

Solar Panel Warranty

Engineering Based Assessment
Professional Assessment
DISCOM Compliant Approach
80/20 Cost Sharing Model
No Guaranteed Returns
Engineering Estimation

How Project Estimation Works

Our estimation process uses standard engineering formulas to calculate solar capacity and project costs based on your property size.

Land Solar Estimation

Open Land

Capacity Formula: Acres ÷ 5 = MW

Cost Formula: Capacity (MW) × ₹2.75 Cr/MW

1 Acre → 0.20 MW → ₹55 L project cost
5 Acres → 1.00 MW → ₹2.75 Cr project cost
25 Acres → 5.00 MW → ₹13.75 Cr project cost

Approx. 5 acres per MW for ground-mounted solar. Cost benchmark: ₹2.75 Cr/MW for utility-scale installations.

Rooftop Solar Estimation

Roof Area

Capacity Formula: Sq Ft ÷ 100 = kW

Cost Formula: Capacity (kW) × ₹27,500/kW

1,000 sq ft → 10 kW → ₹2.75 L project cost
5,000 sq ft → 50 kW → ₹13.75 L project cost
25,000 sq ft → 250 kW → ₹68.75 L project cost

Approx. 100 sq ft per kW for rooftop solar. Cost benchmark: ₹27,500/kW for rooftop installations.

Contribution Split — 80/20

Example: 5 Acre Land — 1.00 MW — ₹2.75 Cr project cost

Installed Capacity

1.00 MW

5 Acres ÷ 5 = 1 MW

Company Share (80%)

₹2.20 Cr

Company invests majority

Owner Share (20%)

₹55 L

Owner contribution

Cost Sharing Model

How Cost Sharing Works

Understand exactly how project costs are shared — no hidden costs.

Cost Sharing — 80/20

80% Company
20% Owner

Of the total project cost, the company pays 80% and you pay only 20%. This includes everything:

Solar Panels
80% Co.20% You
Inverter
80% Co.20% You
Civil Work
80% Co.20% You
Electrical Upgrades
80% Co.20% You
Monitoring System
80% Co.20% You
Maintenance
80% Co.20% You

Cost Sharing Model

Your 20% contribution covers your share of the total project cost. The company invests the remaining 80%.

What the Company Covers (80%)

Solar panels, inverters, civil work, electrical upgrades, monitoring system, and maintenance.

What You Contribute (20%)

Your share of total project cost as per the 80/20 cost-sharing model. Terms finalized by mutual agreement.

All estimates are indicative. Final project scope and costs are determined after technical feasibility review and mutual agreement.

Project Estimation

Project Estimation by Property Size

See estimated capacity, project cost, and contribution split for different land sizes. Based on 80/20 cost-sharing model.

1 Acre Land

(4,840 Sq Yards · 0.40 Hectare)

0.20 MW

Capacity

Project Cost

₹55 L

Company (80%)

₹44 L

Owner (20%)

₹11 L

5 Acre Land

(24,200 Sq Yards · 2.02 Hectare)

1.00 MW

Capacity

Project Cost

₹2.75 Cr

Company (80%)

₹2.20 Cr

Owner (20%)

₹55 L

10 Acre Land

(48,400 Sq Yards · 4.05 Hectare)

2.00 MW

Capacity

Project Cost

₹5.50 Cr

Company (80%)

₹4.40 Cr

Owner (20%)

₹1.10 Cr

25 Acre Land

(1,21,000 Sq Yards · 10.12 Hectare)

5.00 MW

Capacity

Project Cost

₹13.75 Cr

Company (80%)

₹11.00 Cr

Owner (20%)

₹2.75 Cr

50 Acre Land

(2,42,000 Sq Yards · 20.23 Hectare)

10.00 MW

Capacity

Project Cost

₹27.50 Cr

Company (80%)

₹22.00 Cr

Owner (20%)

₹5.50 Cr

All estimates are indicative and based on engineering benchmarks. Actual costs may vary based on site conditions.

Large solar farm aerial view — utility scale solar installation in India

Large Scale Solar Farms

From 1 acre to 50+ acres — we develop utility-scale solar infrastructure across India. All projects follow 80/20 cost sharing model. No guaranteed returns.

10 Acres

48,400 Sq Yards · 4.05 Hectares

2.00 MW

₹5.50 Cr

25 Acres

1,21,000 Sq Yards · 10.12 Hectares

5.00 MW

₹13.75 Cr

50 Acres

2,42,000 Sq Yards · 20.23 Hectares

10.00 MW

₹27.50 Cr

Process

How It Works

A streamlined three-step process to transform your property into a solar energy asset.

Step 1

Submit Property Details

Share your property specifications including type, size (in sq ft/acres/meters), location, and current energy usage for initial assessment.

Step 2

Technical Feasibility Review

Our engineering team evaluates solar potential, infrastructure requirements, and development feasibility using satellite data and regional benchmarks.

Step 3

Partnership Proposal

Receive a detailed partnership proposal with 80/20 cost sharing after technical feasibility review.

Partner Network

Be a Solar Partner

Connect property owners with solar infrastructure opportunities. No joining fee, no technical knowledge required.

Earn a 5% one-time commission on eligible successfully executed projects.

Solar monitoring technology dashboard
Technology

Advanced Solar Technology & Monitoring

Our solar installations use Tier-1 panels with 550W capacity, smart inverters, and real-time monitoring systems. Every project is designed to maximize energy generation based on engineering benchmarks.

550W Tier-1 Solar Panels

High efficiency monocrystalline panels with 25-year warranty

Smart Inverter Technology

Grid-tied inverters with efficiency rating above 97%

Real-Time Monitoring

Track generation and system performance from your phone

MNRE Aligned Methodology

Assessment follows Ministry of New and Renewable Energy guidelines

Get Started

Ready to Assess Your Property?

Whether you have a rooftop or open land, our team will assess your solar potential. Company invests 80% — you contribute only 20%.